Industrial Spec Building: Poor Subsoil Solutions
May 16, 2022
The Challenge: CCI was confronted with meeting an accelerated schedule requirement to construct a 500,000 square-foot industrial building while addressing poor subsoil challenges throughout the 56.2-acre site. The project site contains layers of wet clay and uneven topography. Solutions were needed to offer drainage, level the site, and improve load bearing strength, while remaining on schedule. SOLUTION 1: To help reduce moisture...